Adobe
Acrobat Reader is required to view these files.  |
| Click
here to download plan text |
| . |
|
|
| |
SECTION |
PAGE |
| 1.00 |
INTRODUCTION |
1 |
1.01
|
AUTHORIZATION
|
1 |
1.02
|
PURPOSE
OF PHASE 2 STUDY
|
1 |
1.03
|
SCOPE
|
2 |
1.04
|
ACKNOWLEDGEMENTS
|
3 |
| 2.00 |
PHASE
1 DIAGNOSITC/FEASIBILITY STUDY SUMMARY |
3 |
2.01
|
STORMWATER-RELATED
WATER QUALITY CONCERNS
|
3 |
2.02
|
RECOMMENDED
WATERSHED OPTIONS
|
3 |
| 3.00 |
WATHERSHED
CHARACTERISTICS AND SUB-BASIN DELINEATION |
4 |
3.01
|
GENERAL
DESCRIPTION AND LOCATION
|
4 |
3.02
|
OVERALL
WATERSHED DESCRIPTION
|
5 |
3.03
|
SUB-BASIN
DELINEATION FOR STORMWATER TREATMENT PLANNING
|
5 |
| 4.00 |
WATERSHED
HYDROLOGY |
6 |
4.01
|
CLIMATE
|
6 |
4.02
|
JORDAN
POND WATER BUDGET
|
6 |
4.03
|
STORMWATER
FLOWS
|
7 |
| 5.00
|
WATERSHED
STORMWATER MANAGEMENT |
8 |
5.01
|
STORMWATER
QUALITY
|
8 |
5.02
|
STORMWATER
SAMPLING DATA
|
9 |
5.03
|
WATERSHED
NUTRIENT LOADING
|
9 |
5.04
|
NPDES
PHASE II STORMWATER PROGRAM
|
10 |
| 6.00 |
IN-LINE
STORMWATER WATER QUALITY TREATMENT |
10 |
6.01
|
CONCEPT
|
10 |
6.02
|
EFFECTIVENESS
|
11 |
6.03
|
DEVICES
AND SYSTEMS
|
12 |
| 7.00 |
ALTERNATIVE
MANAGEMENT STRATEGIES |
12 |
| 8.00 |
PRELIMINARY
DEVICE SIZING AND LOCATIONS |
14 |
8.01
|
DESIGN
RATIONALES
|
14 |
8.02
|
DEP
STORMWATER MANAGEMENT STANDARDS
|
15 |
8.03
|
SIZING
AND LOCATIONS
|
16 |
| 9.00 |
PRELIMINARY
DEVICE PRIORITIZATION AND COST |
18 |
| 10.00 |
GENERIC
DETAILS AND SPECIFICATION |
19 |
| 11.00 |
OPERATION
AND MAINTENANCE GUIDELINES |
19 |
| 12.00 |
RECOMMENDATIONS
AND CONCLUSIONS |
20 |