Adobe
Acrobat Reader is required to view these files.  |
| Click
here to download plan text |
| . |
|
|
| |
SECTION |
PAGE |
| 1.00 |
INTRODUCTION |
1 |
1.10
|
AUTHORIZATION
|
1 |
1.20
|
PURPOSE
|
1 |
1.30
|
SCOPE
|
1 |
1.40
|
ACKNOWLEDGEMENTS
|
3 |
| 2.00 |
PREVIOUS
STUDIES |
4 |
| 3.00 |
POND
AND WATERSHED CHARACTERISTICS |
5 |
3.10
|
GENERAL
DESCRIPTION AND LOCATION
|
5 |
3.20
|
CLIMATE
|
5 |
3.30
|
WATERSHED
DESCRIPTION
|
5 |
3.40
|
POND
DESCRIPTION
|
6 |
3.50
|
BATHMETRY
& SEDIMENT THICKNESS
|
7 |
3.60
|
LIMNOLOGICAL
CHARACTERISTICS
|
7 |
3.60.1
|
Temperature
|
|
3.60.2
|
Dissolved
Oxygen
|
|
3.60.3
|
pH
|
|
3.60.4
|
Specific
Conductance
|
|
3.60.5
|
Water
Clarity & Turbidity
|
|
3.60.6
|
Biochemical
Oxygen Demand
|
|
3.60.7
|
Waterborne
Pathogens
|
|
3.60.8
|
Nutrients
|
|
3.60.9
|
Trophic
State
|
|
3.70
|
WATERSHED
SAMPLING DATA
|
12 |
3.80
|
SEDIMENT
DATA
|
13 |
| 4.00 |
AQUATIC
VEGETATION & BIOLOGICAL SURVEY |
14 |
4.10
|
AQUATIC
VEGETATION SURVEY
|
14 |
4.20
|
BIOLOGICAL
SURVEY
|
15 |
| 5.00 |
NUTRIENT
AND BACTERIC LOADING |
16 |
5.10
|
NUTRIENT
LOADING
|
16 |
5.10.1
|
Nitrogen
Budget
|
|
5.10.2
|
Phosphorus
Budget
|
|
5.10.3
|
Nutrient
Loading Sources
|
|
5.10.4
|
Impact
of Nutrient Loading
|
|
5.20
|
BACTERIA
LOADING
|
18 |
| 6.00 |
WATERFOWL |
19 |
6.10
|
WATERFOWL
IMPACTS
|
19 |
6.20
|
WATERFOWL
MANAGEMENT OPTIONS
|
19 |
6.30
|
WATERFOWL
CONTROL RECOMMENDATIONS
|
22 |
| 7.00 |
INFLOW/OUTFLOW
AUGMENTATION |
23 |
7.10
|
JORDAN
POND WATER BUDGET
|
23 |
7.20
|
OUTLET
CHANNEL
|
24 |
7.30
|
FLOW
AUGMENTATION CONSIDERATIONS
|
24 |
| 8.00 |
WATERSHED
MANAGEMENT OPTIONS |
26 |
8.10
|
SOURCE
CONTROLS
|
27 |
8.20
|
TRANSPORT
MITIGATION
|
28 |
| 9.00 |
POND
MANAGEMENT OPTIONS |
30 |
9.10
|
PHYSICAL
MANAGEMENT OPTIONS
|
30 |
9.20
|
CHEMICAL
MANAGEMENT OPTIONS
|
36 |
9.30
|
BIOLOGICAL
MANAGEMENT OPTIONS
|
36 |
| 10.00 |
JORDAN
POND MANAGEMENT RECOMMENDATIONS |
37 |
10.10
|
WATERSHED
MANAGEMENT RECOMMENDATIONS
|
37 |
10.20
|
WATERFOWL
MANAGEMENT RECOMMENDATIONS
|
38 |
10.30
|
IN-POND
MANAGEMENT RECOMMENDATIONS
|
39 |
10.40
|
FEASIBILITY
STUDY
|
40 |